Subcontract issue and receipt workflow
Link issued quantities, return records and balances to the original job.
Give stores, production and accounts the same view of material issued to a subcontractor. GreyBath builds ERP workflows that connect the job, material movement, inspection decision and invoice approval.
Explore what we build
01 / What we build
Link issued quantities, return records and balances to the original job.
Show accepted, held and reissued quantities with the evidence and approval owner.
Give accounts the quantities behind the approved invoice and show which lines need a decision.
City context, honestly stated
For projects in Thane, a fabricator in Wagle Estate may send components out for coating or machining. The teams that issue, receive and inspect the work need a reliable record of where every quantity sits. GreyBath delivers through remote workshops, reviews and handover.
A fabrication team issues 100 brackets to a subcontractor for coating. The subcontractor returns 96, and inspection marks six for rework. The ERP records 90 accepted, six returned but held, and four still due. Stores can release the 90 accepted brackets to the next job. Accounts sees the accepted count against the subcontractor invoice and routes any difference to the responsible approver. The pilot checks that the six held parts retain the original job reference and that reissuing them for rework does not accidentally increase the quantity due.
Organise drawing-led enquiries and customer follow-up alongside your current production system. Sales can see the buyer, site, most recent approved quote and next action, while engineering retains control of technical review.
A fabrication buyer sends a revised drawing after receiving a quote. The CRM keeps both revisions and asks engineering to review the change. The sales owner can see that the quote is on hold. When the revision and price are approved, the order team receives the accepted drawing reference and quote together.
Discuss a CRM pilotKeep company, site and buyer contacts connected. Give each quote or service request a named owner and a follow-up date.
Record which drawing was used for each quote, what changed and who authorised the revised offer.
Test a repeat order and a late drawing change. Confirm that the current quote and drawing travel together and that superseded information remains visible to reviewers.
Where it fits
Bring the people who use, review and maintain the first release into the scope discussion.
Trace outside processing without reconciling paper notes at the end of the job.
Use the same quantities and job reference when releasing stock and approving invoices.
How we work
Trace its issue, return, inspection and invoice using redacted records.
Test how an incomplete quantity and a quality hold affect the job balance.
Stores should see only accepted parts as available, and a reissue for coating should leave the original quantity due unchanged. Accounts should see why an invoice above the accepted quantity is on hold and who can approve an exception. Ask both teams to trace the decision back to the same job before widening the rollout.
The proposal sets the first workflow, delivery responsibilities and the evidence needed before rollout.
Discuss your projectAgree the items, units, process steps and conditions for partial return or rework.
Agree which system owns the job and stock ledger. If a portal captures inspection, decide who can release the accepted quantity to the ERP and what reference it sends back. Keep invoice posting with the agreed finance owner and require a reason and approver for any quantity override.
Bring one redacted issue challan, the return and inspection slips, and the subcontractor invoice. Keep the same job number on each record. Use a partial return with rework so stores, quality and Accounts can check the same balance and identify who can release the held parts.
Yes. Select one outside process and test the material and approval handoffs before widening the ERP scope.
We can scope a connection after checking available interfaces and agreeing where invoice records are owned.
Keep the held quantity linked to the job and record each reissue and acceptance without treating it as a new original issue.
Yes. Agree where customer, quote and order records are owned, then test the handover of one approved quote and its drawing reference to your order team. If you need to migrate existing records, sample them for duplicates and missing links before importing them.
Start with one workflow